Alan R Posted December 29, 2020 Share Posted December 29, 2020 Set the above in Options/media to 2.0s but images dragged to timeline still come in at 3s. Saved value of 2s seems permanent. Even saved project and reloaded, setting shows as 2s but images still come in at 3.0s. Running v8.95 Any ideas? Link to comment Share on other sites More sharing options...
borate Posted December 29, 2020 Share Posted December 29, 2020 That setting affects images added to the bin. To change length of clips already in the bin input the desired duration in the box under the preview window. Link to comment Share on other sites More sharing options...
Nationalsolo Posted December 29, 2020 Share Posted December 29, 2020 Hi Set the default still image duration before adding any images to the program. Version 8.94 retains 2 seconds here. Hover over image in the clip bin...what duration time is shown? If you changed the duration from, say...3 seconds (with images already in the bin even though not used) to 2 seconds, images in the bin will retain 3 seconds and arrive on the timeline with this duration. If, on the other hand you made the change and then added more images, these will take on the new setting. Nat Link to comment Share on other sites More sharing options...
Alan R Posted December 30, 2020 Author Share Posted December 30, 2020 That only resets the duration to the selected one. So I guess that provides a way to override the preset value. Thanks Link to comment Share on other sites More sharing options...
borate Posted December 30, 2020 Share Posted December 30, 2020 Select the ones you want to change. Right-click on any one of them. Change Clip Speed, and input the desired length. That will change them all. Link to comment Share on other sites More sharing options...
Alan R Posted December 30, 2020 Author Share Posted December 30, 2020 It is as you expect ie the value as set in Options/media that was prevalent when the images were loaded. I think my question arose because my last editor applied the default value when the image was dragged from bin to timeline, the image in bin had no duration. Thus you could change your mind part way through a project to set a new default while processing say the next 20 images, then change it again so some other value. I just had not twigged that VP was setting the default duration when the images were loaded. Interesting - it is literally when the image is loaded. I just changed the default and loaded one more image, it is now the new default. So thanks - I now know whats going on and can play to the VP rules. Whether better or worse than my previous editor remains open to debate, at least I now understand. Thank you. Link to comment Share on other sites More sharing options...
Alan R Posted December 30, 2020 Author Share Posted December 30, 2020 14 minutes ago, borate said: Select the ones you want to change. Right-click on any one of them. Change Clip Speed, and input the desired length. That will change them all. Yes of course - its getting used to these curious little methods that you guys have been so helpful with - Thank you both. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now