zemanel
-
Posts
2 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Posts posted by zemanel
-
-
Hello,
i'm from Portugal Europe and while editing invoice options on OSX, the measure values are comma separated. ex.: "2,75" and result in validation issues with "must be positive number", every time the options are edited and even after changing the values to dot separation, ex.: "2.75"
OSX options measures results in "positive integer required"
in Express Invoice
Posted
UPDATED:
the correct error is "must be positive number"